After twenty-four hours the tiles are set and can be washed using water and cleaning agent. The tiles is now ready to be stepped on!...

0
0

10

After twelve hours, check if there are gaps under the tiles with a hammer, re-tile if necessary....

0
0

09

After one hours, clean up the cement residue and other wastes on the tiles....

0
0

08

Try knocking the installed tiles with hammer handle to confirm its fullness....

0
0

07

For corner installation, use proper dose of sticky cement and level. Keep the thickness to 1cm and cover the corner with another tile before gently hammering it using a wooden hammer....

0
0

06

While paving, ensure that there is no cement leftover between the gaps....

0
0

05

To avoid misalignment, leave a gap between each ceramics of 3mm for external installation, 1.5mm for interior installation. 3-5mm for floor installation....

0
0

04

Apply cement #325, cement #425 or a mixture of cement and tile strengthening agent to the intended surface....

0
0

03

Draw lines on the surface as paving guidance and make sure that the installation ground is level by using an altitude meter....

0